The Park is NOW OPEN Opening hours are 10AM to 10PM Monday to Saturday and 10AM to 8PM on Sundays. (Beginners ONLY 1st Hour saturday & Sunday)
Entrance charges are :-
# £4 for 2 hours
# £5 for 3 hours
# £2 for each extra Hour over 3hrs
# £10 for an all day ticket
# Non Members pay an additional £2 day membership
# Annual membership is £10 from 1st September 2007
The skatepark is made up of 3 large Units which are interconnected.
Unit 1 contains mostly smaller equipment which is primarily but not exclusively aimed at beginners and skateboarders. Ukskate have already made some very significant improvements to this area. There is a small Miniramp approx 1metre high and 3metres wide. There are 2 flatbanks, a few smallish Quarterpipes, a low curved rail, a long low Square edged Grind box with a high Coping edged back, and a small square "Ollie Box" on top of one centre area. We have also commenced work on a new section in this area where we have knocked down the old Kitchen wall to create more room. This will have a flatbank and quarter pipe at one end, with a Quarterpipe at the other end. In bteween will be a number of "Moveable" obstacles including various shapes grindboxes with coping and/or Square edges, Curved and Triangle Kickers/launch boxes, and P-Rails etc
Unit 2 is the Street area with larger ramps, A big flat bank rollin, centre fun Box with an array of Grind Boxes, Rails etc (much more to come in this area including a long drop ledge), a Big Quarter to Quarter wall ride Transfer, a Flat bank at the base of the wall ride, A large Spined Ramp and 2 more Quarter Pipes.
Unit 3 (Downstairs) is the Transitions and "real street" area. This houses an infamous Peanut shaped Skatebowl with a Round deep end and a round shallow end. There is a large 6ft Half pipe approx 6metres Wide which has a 2 ft sub box with coping along one side and a 1 ft square edged Sub box along the other side. There is a Flat bank transfer from the halp pipe to an unusual Dual Height Vert/Midi Ramp. This has an 11ft Vert on one side and an 8ft Midi on the other side, Great for those Huge airs !
There are transfer opportunities between the Vert/Midi and Halfpipe and from there in to the Bowl if you are feeling Brave !
There is a Jump Box which currently has a 7ft Quarter pipe at one end and a 15ft Wall Ride Quarter at the other end, though this will be changed and improved in plans coming soon.
The "real Street" area has a 15 foot long Street Rail down a flat Bank and a 15ft long High Ledge down the same flat Bank. This now has a Longer, mellower Flat Bank with an adjustable height Rail (16 inches upto about 3.5ft high) 15ft long and a Ledge on both the left and right hand side of the Bank. The rail will soon be able to be inter-changed with a square rail for Skateboard events etc.
The Floor in this area is a smooth concrete, whereas the rest of the park is all plywood flooring. In the next few months, we now have 30 ft long ledges along both sides of this area. One is made similar to Urbis ledge height and the other similar to Castlefield ledge height, in order to simulate use of the most popular street skating places in Manchester.
We have many more plans to improve the park and will be continually upgrading areas of the park to keep it fresh and give the skatepark users new challenges.
Spotted by Steve Bass
Extreme Sports Map needs you! Tell us about your favourite places to ride by adding a spot to Extreme Sports Map.
Add a New SpotExtreme Sports Map contains thousands of spots and grows every day.
See the whole Extreme Sports Map...
See everything on the United Kingdom map
More Skateparks in United Kingdom
More Skateparks worldwide